Projects
Engineering, infrastructure and technology projects across Australia and internationally.
Projects

Stockpile Dam, Clermont Coal Mine
Regulated damDam delivery from front-end loading through design, tender and execution

Lease-wide flood modelling and catchment plans, Clermont
Three mining leasesHydraulic modelling and catchment planning

Tailings-dam raise front-end loading, Saraji Mine
$25M tailings-dam raise; 18 monthsFront-end loading of the raise: scope definition, HAZOP and HAZID

Tailings-dam raise execution, Blackwater Mine
Execution-phase tailings-dam raiseConstruction scheduling, reporting, quality assurance and remedial design

Tailings storage facility raise delivered ahead of its statutory deadline
Accelerated two-month programme to the statutory DSA deadlineProgramme recovery, quality assurance and ancillary works delivery

Multidisciplinary capital and maintenance works
Haul roads, pumps and pipelines, tailings, stormwater and rehabilitationCapital and maintenance project delivery, design documentation and electrical compliance
134 South Street, Thornlands
A coordinated civil-engineering response covering stormwater, water, sewer and traffic for a development application information request.
Read the case studyEngineering projects
Mine, council, road-authority and development engineering, from tailings dams and flood recovery to subdivisions and certification.
- Tailings-dam raise execution, Saraji MineSaraji Mine, Dysart, Queensland · October 2010–February 2013 — $15M tailings-dam raise
- Isaac flood restoration and floodway constructionClermont, Queensland · 2013 — $15M restoration contract; 1,500+ works; 15 reinforced-concrete floodways
- Gold Coast landfill modelling and 30‑year programmeGold Coast, Queensland · 2019 — Integrated 30-year landfill capping, rehabilitation and development programme
- Conveyor remediation, Clermont Coal MineClermont Coal Mine, Queensland · May 2023–June 2025 — Emergency remediation of a moving conveyor alignment
- Bowen landfill leachate tank pad worksBowen, Queensland · February–July 2026 — 12 ML leachate tank pad
- Multi-unit development civil and traffic engineeringRedlands, Queensland · January–September 2026 — Traffic, stormwater, sewer and water reports with Council and State referral responses
- Rural subdivision operational-works design packageLogan region, Queensland · May–October 2026 — 14-sheet design package for three rural-residential lots
- Mine Water Dam preliminary design, Clermont Coal MineClermont Coal Mine, Queensland · May 2023–June 2025 — Site's main regulated water-storage dam
- Subdivision geotechnical and mine-subsidence assessmentTivoli, Ipswich, Queensland · August–October 2026 — 90-page report; research across 155 nearby applications and 2,026 public documents
- Subdivision design certification and construction inspectionsLogan region, Queensland · 2025–2026 — Operational-works certification, pavement design and construction-phase inspections
- As-constructed earthworks and stormwater certificationBrisbane, Queensland · August–September 2026 — Two adjoining subdivision sites; AS 3798 Level 2 testing
- Somerset Regional Council civil design programmeEsk, Queensland · October 2008–October 2010 — Regional civil design programme
- New council landfill, Somerset RegionSomerset Region, Queensland · 2008–2010
- Lowood–Patrick Estate Road bridge approachesLowood–Patrick Estate Road, Somerset Region, Queensland · 2008–2010
- Buloke Shire works programmeBirchip, Victoria · 2004–2006 — Whole-shire civil and waste programme
- Closed landfill rehabilitation, Buloke ShireBuloke Shire, Victoria · 2004–2006
- Rural addressing system rollout, Buloke ShireBuloke Shire, Victoria · 2004–2006
- City works coordination, FremantleFremantle, Western Australia · January 2014–December 2015 — 60+ staff; 30+ contractors
- City waste service management, FremantleFremantle, Western Australia · January 2014–December 2015 — About $8M annual operating budget
- Shire of Wyalkatchem works programmeWestern Australia · 2016–2018 — Whole-shire works programme
- Flood damage recovery, Shire of WyalkatchemShire of Wyalkatchem, Western Australia · 2017–2018 — 155 repair works over 12 months
- New landfill facility, Shire of WyalkatchemShire of Wyalkatchem, Western Australia · 2016–2018
- Legacy landfill closure, Shire of WyalkatchemShire of Wyalkatchem, Western Australia · 2016–2018 — Multiple legacy landfill sites
- Annual road reseal programme, Shire of WyalkatchemShire of Wyalkatchem, Western Australia · 2016–2018
- Underground mining contracts, Queensland and Western AustraliaQueensland, Western Australia and Papua New Guinea · December 2006–October 2008 — Multiple underground work fronts
- Ok Tedi tunnel-boring-machine materials logisticsOk Tedi, Papua New Guinea · 2006–2008
- Mine-entrance and security-access works, Peak Downs MinePeak Downs Mine, Dysart, Queensland · October 2010–February 2013
- ROM lighting-tower replacement, Saraji MineSaraji Mine, Dysart, Queensland · October 2010–February 2013 — $3M
- Surat Gas Project roadworksDalby region, Queensland · March–September 2022 — Minor road programme
- Water fill point, Clermont Coal MineClermont Coal Mine, Queensland · May 2023–June 2025 — Concrete pad, drainage channel, sump, pumps and pipelines
- Industrial Area Dam desilting, Clermont Coal MineClermont Coal Mine, Queensland · May 2023–June 2025 — Desilting and minor expansion
- Main Roads traffic and civil engineeringGold Coast, Queensland · January 2002–January 2004 — Signalised corridors and road and intersection design
- Storm-damaged rural driveway and culvert assessmentSouth East Queensland · May–June 2025 — 600 mm culvert; non-destructive asphalt thickness testing
- Rural property access approval and crossover designLogan region, Queensland · 2025 — TMR section 33 Minor Works approval and crossover design
- Residential retaining-wall design and site surveyQueensland · 2013 — Two-sheet retaining-wall plan
- Unified capital-project reporting, City of FremantleFremantle, Western Australia · 2014–2015 — City capital works programme across several project managers
- Business-process mapping, Clermont Coal MineClermont, Queensland · May 2023–June 2025
- Business-process mapping, BHP Saraji MineSaraji Mine, Dysart, Queensland · 2010–2013
GIS, data systems and automation
Spatial systems, field applications, databases and reporting automation built into engineering projects, from council road networks to operating mines.
- GIS and project reporting, Tropicana gold mineTropicana gold mine, Western Australia · 2020–2022 — GIS of all mine-site infrastructure and services
- Tailings-dam raise project controls, Blackwater mineBlackwater mine, Queensland · 2018 — Excel dashboards, automated reporting and GIS-to-CAD set-out for a tailings-dam raise
- ArcGIS mapping for a tailings dam raise, QAL refineryGladstone, Queensland · 2025 — Site mapping for a tailings storage facility raise
- Rehabilitation and closure plan tracking, Clermont coal mineClermont coal mine, Queensland · 2023–2025 — Rehabilitation milestone and compliance reporting through to 2042
- Project management tool, Clermont coal mineClermont coal mine, Queensland · 2023–2025
- Tracking of flood restoration works, Isaac regionIsaac region, Queensland · 2013 — Tracking for 1,500+ repair works on a $15 million restoration contract
- Flood recovery tracking and field app, WyalkatchemWyalkatchem, Western Australia · 2015–2018 — Tracking and field app for 155 flood-repair works
- Roadworks tracking and GIS sequencing, Surat Gas ProjectDalby region, Queensland · 2022 — Work-item tracker and GIS haul-route sequencing for the Dalby road programme
- Waste fleet billing reconciliation, City of FremantleFremantle, Western Australia · 2014–2015 — City waste service with an annual operating budget of about $8 million
- Shire-wide road asset management2005 — Whole shire road network
- Windows desktop time-distance diagram application2004
- COUNT intersection volume calculator, Department of Transport and Main RoadsGold Coast, Queensland · 2002–2004 — 323 census count workbooks, 1999–2003
- Basin-wide environmental-monitoring GIS and web mapCentral Queensland, basin-wide · April–June 2025 — 76 layers standardised; 49 monitoring datasets converted; six-theme map series
Our products
Software we develop and operate. Each product is described in the software portfolio.
- SigTDD browser application for traffic signal coordinationBrowser application; successor to the 2004 desktop application
- TaskRox project platform and Android field clientWeb platform and native Android field client
- SMSuni business messaging and API platformAustralia — Web dashboard and developer API
- PraqsenProcess governance — Process mapping and governance: one maintained, approved version of every process.
Engineering software
Concrete-section and intersection analysis software.