Tailings-dam embankment raise design and certification.
Hydraulic analysis and seepage modelling.
Construction supervision.
RPEQ-certified design packages compliant with ANCOLD guidelines.
Bowen Basin, Queensland · 2023
Open-cut mine haul road network
Design of a 15 km haul road network — geometric alignment, drainage structures and intersection layouts — optimised for ultra-class haul trucks.
Location
Bowen Basin, Queensland
Role
Haul road network design
Scale
15 km haul road network for ultra-class trucks
Period
2023
Disciplines
Haul roads, Mining, Civil design
Work delivered
Geometric alignment of a 15 km haul road network.
Drainage structures and intersection layouts.
Design optimised for ultra-class haul trucks, with sight distance and grade constraints.
Northern Queensland · 2022
Township flood mitigation works
Hydraulic modelling and design of a levee system, pump stations and floodway upgrades giving Q100 flood protection to critical township infrastructure.
Location
Northern Queensland
Role
Hydraulic modelling and flood mitigation design
Scale
Levee system, pump stations and floodways; Q100 protection
Period
2022
Disciplines
Flood modelling, Levee design, Hydrology
Work delivered
Hydraulic modelling of the township flood behaviour.
Design of a levee system, pump stations and floodway upgrades.
Q100 flood protection for critical township infrastructure.
Western Queensland · 2025
Western corridor regional road upgrade
Reconstruction of a 45 km regional road corridor: geometric design, drainage improvements, pavement rehabilitation, flood immunity upgrades and new culverts.
Location
Western Queensland
Owner
Queensland Department of Transport and Main Roads
Role
Road, drainage and pavement design
Scale
45 km regional road corridor reconstruction
Period
2025
Disciplines
Road design, Drainage, Flood modelling
Work delivered
Geometric design of a 45 km regional road corridor.
Drainage improvements and new culvert structures.
Pavement rehabilitation.
Flood immunity upgrades.
Surat Basin, Queensland · 2024
Industrial water pipeline network
Hydraulic design and pump station sizing for a 28 km industrial water supply network, with surge analysis and SCADA integration.
Location
Surat Basin, Queensland
Role
Hydraulic design and pump station sizing
Scale
28 km industrial water supply network
Period
2024
Disciplines
Pipeline design, Hydraulics, Pump systems
Work delivered
Hydraulic design of a 28 km industrial water supply network.
Pump station sizing and surge analysis.
Pipeline route optimisation.
Integration with the existing SCADA systems.
South East Queensland · 2023
Stormwater management for a 120-lot subdivision
Stormwater management design for a 120-lot residential subdivision, certified under the Queensland Urban Drainage Manual.
Location
South East Queensland
Role
Stormwater management design
Scale
120-lot residential subdivision
Period
2023
Disciplines
Stormwater, WSUD, Subdivision
Work delivered
Water-sensitive urban design features.
Detention basin design.
Lawful point of discharge analysis.
Certification under the Queensland Urban Drainage Manual.
Thornlands, Queensland · 2026
134 South Street, Thornlands
A coordinated civil-engineering response covering stormwater, water, sewer and traffic for a development application information request.
Location
Thornlands, Queensland
Role
Civil and traffic engineering; RPEQ review and certification
Scale
15-unit multiple-dwelling development
Period
2026
Status
Information-request response complete
Disciplines
Stormwater, Water and sewer, Traffic, RPEQ certification
Challenge
The development application needed one coordinated response to the council's information-request items on stormwater quantity and quality, water servicing, sewer servicing and access.
Approach
The engineering for the response was prepared, reviewed and certified as one set, bringing the civil and traffic assessments together.
Result
The final report set answered the information request with a coordinated detention and bioretention concept, servicing evidence and an access-separation assessment.
Deliverables
Stormwater management plan with supplementary water assessment
Certified sewer and water servicing assessments
Traffic impact and site-access assessment
Concept drawings and calculations
Access plan: the proposed crossover and its separation from the nearby signals. Open full sizeStormwater sheet: rear-strip detention and bioretention in plan and section. Open full sizeReports
Traffic impact assessment · Revision 4, public issue