Mine water storage with illustrated pump, embankment and drainage upgrades

Engineering beyond the conventional.

Engineering, surveying, software and AI, backed by decades of practical project delivery, across Australia and internationally.

20+years of engineering delivery across mining, infrastructure and local government
Australian-basedDelivering nationally and internationally.

Projects

Tailings and mine-water storage, flood restoration, mine infrastructure and development civil works.

All projects
Pump station and pipework on the water of the Stockpile Dam at Clermont Coal Mine, with the plant behind
Clermont Coal Mine, Queensland · 2023–25

Stockpile Dam, Clermont Coal Mine

Regulated dam

A regulated stockpile dam delivered from front-end loading through detailed design, tender and execution.

Overland conveyor and service road beside the Blair Athol rehabilitation area at Clermont Coal Mine, part of the lease covered by the catchment plans
Clermont Coal Mine, Queensland · 2023–25

Lease-wide flood modelling and catchment plans, Clermont

Three mining leases

Hydraulic modelling, flood analysis and catchment plans for the entire Clermont mine lease, the Blair Athol lease and Cement Hill.

Mine water storage at Saraji Mine with a floating pump pontoon, lit walkway and rock-armoured dividing embankment
Saraji Mine, Dysart, Queensland · 2010–13

Tailings-dam raise front-end loading, Saraji Mine

$25M tailings-dam raise; 18 months

Front-end loading of a $25M tailings-dam raise over 18 months, with HAZOP and HAZID reviews.

Tailings pipeline along the crest of the tailings dam at Blackwater Mine during the 2018 raise, at dawn, with the tailings beach and pond beyond
Blackwater Mine, Queensland · 2018

Tailings-dam raise execution, Blackwater Mine

Execution-phase tailings-dam raise

Construction controls and a geotechnical remedial design during a tailings-dam raise at BMA's Blackwater Mine.

Rock-armoured crest of the raised tailings storage facility embankment at the QAL refinery, Gladstone, with the tailings pond beside it
QAL refinery, Gladstone, Queensland · 2025

Tailings storage facility raise delivered ahead of its statutory deadline

Accelerated two-month programme to the statutory DSA deadline

Recovery of a delayed tailings storage facility raise at risk of missing its statutory DSA compliance deadline, delivered one week ahead of that deadline.

Aerial view of the Tropicana Gold Mine tailings storage facility, with the open pits and plant beyond in the Great Victoria Desert
Tropicana Gold Mine, Western Australia · 2020–22

Multidisciplinary capital and maintenance works

Haul roads, pumps and pipelines, tailings, stormwater and rehabilitation

Capital and maintenance projects across the Tropicana gold mine — haul roads, intersections, pumps and pipelines, tailings maintenance, stormwater and rehabilitation — with for-construction drawings and tender documents.

Where the work is

From the Bowen Basin coal mines to the Western Australian goldfields, and from regional council road networks to South East Queensland development, we deliver engineering where projects are built. Based in Brisbane, we take commissions across Australia and internationally.

Open the full-size map
Map of Australia marking RPEQ Consulting project locations in Queensland, Western Australia and Victoria, with the Brisbane base.

Engineering and surveying

A single scope and a single point of responsibility when a project needs several disciplines at once.

All services

Software and AI

Applications, AI and data systems built by software engineers who design, build and run their own products: TaskRox, SigTDD, SMSuni and Praqsen.

Software and AI

Who RPEQ Consulting works for

Mine owners and operators, councils and state agencies, developers and other consultancies.

All sectors

Technical capability

Engineering judgement stays with registered engineers. Computational analysis, digital systems, automation and AI-supported workflows carry the work around it.

How delivery works

Why RPEQ Consulting

  1. One point of responsibility

    One scope and one coordinated response when a council, an authority, a mine or a business needs several disciplines at once: engineering, surveying and software.

  2. Clear scope, organised responses

    Every engagement starts from a written scope, and every document states its purpose and the project stage it serves.

  3. Registration where it matters

    Each engineering discipline is delivered by engineers registered in that area, so certification and direct supervision are arranged before the work starts.

Discuss your project with us.

Send the site or the system, the required outcome and the timeframe; the reply sets out the scope.