Lease-wide flood modelling and catchment plans, Clermont

Hydraulic modelling, flood analysis and catchment plans for the entire Clermont mine lease, the Blair Athol lease and Cement Hill.

The work

Hydraulic modelling and flood analysis across three mining leases, with a stormwater catchment plan for each.

Catchment areas and water-storage sizing were assessed, with recommendations for optimisation, and the site water-storage TARPs were reviewed and strengthened.

Location
Clermont Coal Mine, Queensland
Owner
Glencore
Role
Hydraulic modelling and catchment planning
Scale
Clermont mine lease, Blair Athol lease and Cement Hill
Period
May 2023–June 2025
Status
Delivered
Disciplines
Mining, Water and hydraulics, Environmental

Technology

  • Hydraulic modelling
  • Catchment analysis

Capability

  • hydrology
  • flood analysis
  • catchment planning

Catchment plans

One-page stormwater catchment plans prepared from the lease-wide hydraulic modelling.