RPEQ certification

RPEQ certification and design review

Design review, verification and RPEQ certification for Queensland projects, in every discipline we offer.

How we review and certify

Every commission is delivered and certified by engineers registered in the relevant area of engineering. Certification and direct supervision are arranged before the work starts, so the certifying engineer directs the work rather than checking it at the end.

A review identifies the discipline, the design information available, the investigation needed and what the receiving authority or client requires, then documents the findings, the changes required and the certification provided.

See our projects

Defining the review

  1. Confirm the design purpose, criteria and scope of review.

  2. Examine drawings, calculations, assumptions and supporting information.

  3. Document the findings, the changes required and the certification provided.

All services

Common questions

What is an RPEQ?

A Registered Professional Engineer of Queensland is an individual registered with the Board of Professional Engineers of Queensland (BPEQ). Engineering responsibilities must match the relevant area of registration and competence; registration is not a company accreditation.

BPEQ: project certification

When is an RPEQ needed?

Professional engineering services in or for Queensland must be provided by an appropriately registered RPEQ or under qualifying direct supervision. Work carried out only under a qualifying prescriptive standard falls outside the statutory definition of professional engineering services. Using an Australian Standard does not automatically make work prescriptive.

BPEQ: professional engineering services and prescriptive standards

What does project certification involve?

Certification is provided by an individual RPEQ after appropriate investigation of the engineering work. Its scope and required form depend on legislation, the client or the receiving authority. A project involving different engineering disciplines may require more than one responsible RPEQ.

BPEQ: project certification

Is a final design check the same as direct supervision?

No. Direct supervision involves direction, oversight and evaluation while the engineering service is being carried out, together with direct contact and professional responsibility. A check or signature at the end alone does not constitute direct supervision. Establish the required arrangement before the work begins.

BPEQ: direct supervision

What about designs prepared interstate or overseas?

The Queensland requirements can apply even when the designer works elsewhere. Engage the appropriate RPEQ early. A later independent review has its own scope; it does not retrospectively establish direct supervision of the original work.

BPEQ: work performed outside Queensland

What information is needed to define the review?

Provide the project location, design purpose, drawings, calculations, supporting reports, applicable conditions and the current design stage. Identify who prepared and reviewed the work and what certification the recipient requires. The scope and fee depend on complexity, available evidence and the investigation needed.

These explanations summarise BPEQ guidance. The detailed requirements under the Professional Engineers Act 2002 (Qld) are set out in the official BPEQ practice notes.

Establish the right review scope.

Include the project stage, the existing design information and the certification or engineering decision required.